Case Studies , Manhattan Product Suite

Rapid Implementation of a New Warehouse for Ecommerce Fulfillment

How ITOrizon designed and delivered a new warehouse WMS in 45 days, reusing all existing equipment and MHE automation

45

Days to design and deliver, using US and offshore teams

2

Physical facilities supporting peak season fulfillment

100%

Existing equipment reused, including MHE automation

Carts

Pick carts to maximize picking efficiency

CLIENT SNAPSHOT

Business Overview

A distribution and retail customer needed a new warehouse to support ecommerce fulfillment. ITOrizon designed and implemented the WMS solution on Manhattan WMOS 2014 with Dematic MHE, collaborating across US and offshore design teams.

INDUSTRY

Distribution & Retail

MARKETS

United States of America and Canada

PROJECT LOCATION

USA

APPLICATIONS IN SCOPE

Manhattan WMOS 2014, Dematic MHE

ERP SYSTEM

Oracle RMS 09

Business Challenges

The project had three expected outcomes: use the new warehouse space efficiently, keep implementation cost low, and be ready for peak season.

Key issues included

Pick Efficiency in the Space

Maximize pick efficiency in the warehouse space while leveraging all existing equipment.

Implementation Cost

Minimize the cost associated with the implementation.

Peak Season Throughput

Warehouse throughput had to meet peak season fulfillment requirements by leveraging two physical facilities.

ITOrizon Solution

ITOrizon designed and implemented a WMS solution that makes the most of the existing space and equipment.

01

Pick Carts for Picking Efficiency

The WMS solution leverages pick carts to maximize picking efficiency in the existing space.

VALUE Higher pick efficiency in the space available.

02

Reuse of Existing Equipment

All existing equipment, including MHE automation, was reused in the new design.

VALUE Lower implementation cost.

03

45-Day Delivery

ITOrizon used its US and offshore design teams to collaborate and deliver in 45 days.

VALUE A rapid implementation.

Results delivered

A pre and post go-live analysis compared units processed before and after the new implementation. The trend shows overall throughput increasing, and it is expected to keep rising as users gain experience in the system.

45 DAYS

From design to delivery.

REUSED

All existing equipment, including MHE automation.

RISING

Overall throughput trend after go-live, per the polynomial trendline.

READY

Picking efficiency gained that supports increasing demand.

Results Delivered

WHAT CHANGEDBEFOREAFTER
Delivery time
×New warehouse to stand up for ecommerce
✓Designed and delivered in 45 days
Equipment
×Existing equipment and MHE in place
✓All existing equipment reused in the new design
Picking
×Pick efficiency to maximize in the space
✓Pick carts maximize picking efficiency
Throughput
×Peak season requirements across two facilities
✓Throughput trending upward after go-live

KEEP EXPLORING

Related Case Studies

Oracle Product Suite

Oracle WMS for Contract Manufacturing

Oracle Product Suite

Oracle Cloud WMS Implementation for an Omni Channel Enterprise

Oracle Product Suite

DP World: Real-Time Transportation Visibility Across Four Disconnected Third-Party Systems

Standing up a new warehouse on a tight timeline?

If you need to reuse existing equipment and meet peak season, that’s exactly the kind of work we do.