Rapid Implementation of a New Warehouse for Ecommerce Fulfillment
How ITOrizon designed and delivered a new warehouse WMS in 45 days, reusing all existing equipment and MHE automation
45
Days to design and deliver, using US and offshore teams
2
Physical facilities supporting peak season fulfillment
100%
Existing equipment reused, including MHE automation
Carts
Pick carts to maximize picking efficiency
CLIENT SNAPSHOT
Business Overview
A distribution and retail customer needed a new warehouse to support ecommerce fulfillment. ITOrizon designed and implemented the WMS solution on Manhattan WMOS 2014 with Dematic MHE, collaborating across US and offshore design teams.
INDUSTRY
Distribution & Retail
MARKETS
United States of America and Canada
PROJECT LOCATION
USA
APPLICATIONS IN SCOPE
Manhattan WMOS 2014, Dematic MHE
ERP SYSTEM
Oracle RMS 09
Business Challenges
The project had three expected outcomes: use the new warehouse space efficiently, keep implementation cost low, and be ready for peak season.
Key issues included
Pick Efficiency in the Space
Maximize pick efficiency in the warehouse space while leveraging all existing equipment.
Implementation Cost
Minimize the cost associated with the implementation.
Peak Season Throughput
Warehouse throughput had to meet peak season fulfillment requirements by leveraging two physical facilities.
ITOrizon Solution
ITOrizon designed and implemented a WMS solution that makes the most of the existing space and equipment.
01
Pick Carts for Picking Efficiency
The WMS solution leverages pick carts to maximize picking efficiency in the existing space.
VALUE Higher pick efficiency in the space available.
02
Reuse of Existing Equipment
All existing equipment, including MHE automation, was reused in the new design.
VALUE Lower implementation cost.
03
45-Day Delivery
ITOrizon used its US and offshore design teams to collaborate and deliver in 45 days.
VALUE A rapid implementation.
Results delivered
A pre and post go-live analysis compared units processed before and after the new implementation. The trend shows overall throughput increasing, and it is expected to keep rising as users gain experience in the system.
45 DAYS
From design to delivery.
REUSED
All existing equipment, including MHE automation.
RISING
Overall throughput trend after go-live, per the polynomial trendline.
READY
Picking efficiency gained that supports increasing demand.
Results Delivered
| WHAT CHANGED | BEFORE | AFTER |
|---|---|---|
| Delivery time | ×New warehouse to stand up for ecommerce | ✓Designed and delivered in 45 days |
| Equipment | ×Existing equipment and MHE in place | ✓All existing equipment reused in the new design |
| Picking | ×Pick efficiency to maximize in the space | ✓Pick carts maximize picking efficiency |
| Throughput | ×Peak season requirements across two facilities | ✓Throughput trending upward after go-live |
KEEP EXPLORING
Related Case Studies
Oracle Product Suite
DP World: Real-Time Transportation Visibility Across Four Disconnected Third-Party Systems
Standing up a new warehouse on a tight timeline?
If you need to reuse existing equipment and meet peak season, that’s exactly the kind of work we do.
- Tell us about your new facility and equipment
- We’ll walk through what a similar approach would take for your operation
- No commitment, just a straight assessment